Fire risk management

Baily Garner Health & Safety fire risk management service has been designed to ensure compliance with The Regulatory Reform (Fire Safety) Order 2005. This places an increasing emphasis on employers’ legal duty to carry out formal fire risk assessments. Nearly all workplaces, non-domestic premises and common areas of flats must now have a ‘suitable and sufficient’ fire risk assessment. The employer, or the person who controls the premises, must ensure a ‘competent person’ carries out this fire risk assessment and that it is recorded.

The fire safety law now:

  • Requires businesses to prevent fires and reduce risk
  • Requires the employer or person who controls the premises to ensure to ensure the safety of everyone who uses your premises and the immediate vicinity

The order applies to virtually all buildings, places and structures other than individual private dwellings. This also includes parts of houses in multiple occupation and the common areas within blocks of flats.

We carry out a thorough assessment of your building which considers the following:

  • Sources of ignition
  • Means of escape
  • Emergency planning and training
  • Fire fighting equipment
  • Sources of fuel
  • Detection and warning systems
  • People at risk
  • Safety of fire fighters
  • Structural features and the spread of fire

Reports are produced on a bespoke basis to suit your needs and to ensure compliance with all current regulations.

For further details on how we can assist you, and for a copy of our scope of services, please contact paul.lennon@bailygarnerhs.co.uk

Our projects

The Scalpel

We acted as CDM advisor throughout the £200 Million development of the 39 storey building.

View project

Tower Bridge

We provided CDM services for the  complete redecoration of the bridge, as well as M&E, electrical upgrades and internal repairs.

View project

Millenium Bridge House

We are acting as Principal Designer and Client CDM Advisor for the redevelopment of this late 1980's office building.

View project

Bridge Masters House

We provided CDM Coordinator and CDM services for the redevelopment of this Grade II listed building.

View project

Bryanston Square

We acted as Principal Designer and CDM Advisor for a repairs and redecoration programme which included a Grade II listed building in the heart of London.

View project

Project Light

We acted as Principal Designer throughout the demolition and construction of 234 New residential dwellings.

View project

Wornington Green

We acted as Principal Designer throughout the construction of a 7-storey block providing 89 apartments.

View project

Old Bailey

We acted as Principal Designer and CDM Advisor for the electrical upgrade works to this iconic building.

View project

Project Nash

We act as Principal Designer and CDM Advisor for the redevelopment of Marble Arch House and adjoining properties.

View project